Nati Access Company has successfully changed out / refurbished over 40 bus bar sections to date, lowering and raising some sections over 100m within the tower.
This project saw NAC technicians successfully install sixteen 320kg 8m long supports, drilling over a thousand 18mm holes through 10mm thick steel and installing bolts in situ.