Author: natiaccess3409

Bus Bar Replacements

Posted on September 2, 2020September 3, 2020 by natiaccess3409

Nati Access Company has successfully changed out / refurbished over 40 bus bar sections to date, lowering and raising some sections over 100m within the tower.

Continue Reading

Maribyrnong Viaduct Strengthening Works

Posted on September 2, 2020September 2, 2020 by natiaccess3409

This project saw NAC technicians successfully install sixteen 320kg 8m long supports, drilling over a thousand 18mm holes through 10mm thick steel and installing bolts in situ.

Continue Reading

Heritage Listed Stick Shed Repairs

Posted on October 9, 2019September 2, 2020 by natiaccess3409

Repairs inside the roof of the Murtoa Stick Shed, built in 1941 and the largest rustically-built structure in the world.

Continue Reading